Foreign Client Aluminum Alloy Product Order Full Process: Standardization, Transparency & Efficiency

A 15-stage standardized workflow covering inquiry, design, quotation, mold manufacturing, sampling, production, inspection, payment & logistics—with clear timelines to ensure transparent collaboration and efficient delivery for global aluminum alloy orders.

Tony Buy

11/21/20252 min read

Foreign Client Aluminum Alloy Product Order Process

The order process for aluminum alloy products tailored to foreign clients consists of 15 sequential stages, with clear task definitions and estimated timeframes as follows:

  1. Client Inquiry (1–2 business days): The client initiates the process by submitting specific product requirements, including details such as product usage, technical specifications (e.g., dimensions, material grades), and order quantity.

  2. Design & Drawing Submission (3–5 business days): Based on the client’s requirements, the supplier develops and provides 2D or 3D technical drawings of the aluminum profiles, ensuring all specifications are accurately reflected.

  3. Design Review & Revision (2–4 business days): Both parties collaborate to review the feasibility of the drawings, focusing on factors like extrusion process compatibility and material suitability. Revisions are made iteratively until the design is mutually confirmed.

  4. Quotation (1–2 business days): The supplier issues a detailed quotation covering key cost components, such as tooling fees, sample fees, mass production costs, surface treatment charges, and logistics expenses.

  5. Tooling Fee Payment (2–3 business days, depends on payment method): The client completes the transfer of the tooling fee, which serves as the official confirmation to commence mold manufacturing.

  6. Mold Manufacturing (7–15 business days): The supplier produces extrusion molds using H13 steel, a material selected for its high temperature resistance and durability. The molds undergo heat treatment to enhance their performance and service life.

  7. Sample Production (3–5 business days): A test extrusion is conducted to produce product samples, which then undergo specified surface treatments (e.g., anodizing, powder coating) to match the client’s requirements.

  8. Sample Testing & Compliance Check (3–7 business days): The samples undergo rigorous testing, including dimensional accuracy verification and performance evaluations (e.g., tensile strength). Additionally, compliance with the target market’s relevant standards (e.g., EU REACH regulations) is verified.

  9. Sample Confirmation (2–3 business days): The client reviews and approves the samples, typically formalized by signing a Sample Confirmation Form to confirm readiness for mass production.

  10. Order Deposit Payment (2–3 business days): The client pays a 30% deposit of the total order value, which triggers the official launch of mass production.

  11. Mass Production (10–20 business days, depends on order quantity): The full production process is executed, encompassing aluminum extrusion, surface treatment, and precision finishing operations such as cutting and drilling, to meet the order volume requirements.

  12. Production Completion & Inspection (2–3 business days): Upon completion of mass production, a final quality inspection is conducted, covering product dimensions, appearance (e.g., surface smoothness, color consistency), and performance to ensure compliance with standards.

  13. Balance Payment Collection (2–3 business days): The client settles the remaining balance of the order value to finalize the payment process.

  14. Logistics & Customs Clearance Arrangement (2–4 business days): The supplier arranges for transportation (e.g., sea or air freight) and prepares all necessary customs clearance documents, including commercial invoices and certificates of origin (CO).

  15. Shipment to Destination Country (varies by shipping method): The finished products are shipped to the client’s designated address. Sea freight typically takes 20–35 days, while air freight offers a faster option with a 3–7 day timeframe.